Congrats! You bring up an interesting point with that quote. Do you believe a SGR can be achieved (through unlikely measures like dramatically increased revenue) without major, long-term shutdowns?
Not really. We've dug ourselves too deep. As Jim says, the piecemeal approach we've taken isn't working. We can continue to suffer signal & switch problems for the rest of eternity and fix them one by one every time they fail or we can suffer (big time) for 6 months or so with a total accelerated overhaul (will require massive amounts of funding) and come out in the end with a modern reliable system. The T is figuring this out with station ADA renos, Government Center most notably. With the station closed, it took 2 years of intense suffering for an amazing end result, opposed to the 6 years of messy partial closures and construction barriers. Science Park was also done that way, as a counter to the sloppy way Arlington & Copley were done that dragged on for years.