Green Line Extension to Medford & Union Sq

Some Lechmere area photos shot from a mostly moving car [through my open Moon/Sun roof] on McGrath Highway en route home from the MOS

DSCN1195.JPG

the old viaduct to be replaced
DSCN1198.JPG

some of the construction for the New under the Old

DSCN1199.JPG

Under the Old looking along the New paralleling McGrath Highway

DSCN1202.JPG


Leaving the Old for the New

DSCN1205.JPG

Running with the New [last Bent of the Old even with the camera]
 
Is there a final design for the ball square Broadway Bridge somewhere?
 
The augur was active at the Washington street bridge this morning. (I watch the construction with my toddler most mornings while we wait for the bus).
 
Hello Whighlander , I took this pictures from inner belt road, Somerville
9ED1294A-63EE-429C-8B88-9B9C36187C2E.png
 
Based on a Lechemere "drive under" I can easily believe that Lechmere & Union Square are year away from opening (ok, 15 months)
 
Based on a Lechemere "drive under" I can easily believe that Lechmere & Union Square are year away from opening (ok, 15 months)
Arlington -- remember that the Lechmere Viaduct reconstruction doesn't start for a month and will last for a year or so just to get back to where we are today

I'd put my money on 15 to 18 months to get to the point where a train can leave Lechmere headed for Union Sq.
 
I know this is not the thread for it, but does anyone know why the relatively-new School St bridge has that additional truss above the road surface?
 

Back
Top