Commuting Boston Student
Senior Member
- Joined
- Jan 17, 2012
- Messages
- 1,168
- Reaction score
- 1
I argue for sweeping core improvements like Green Line Heavy Rail because I do see getting even one big thing done setting off a domino effect of improvements in the wake of having finally overcome everything acting to oppose improvement. I don't think Red-Blue or Blue to Lynn would have any real problems getting off the ground in the wake of such a huge undertaking, and once you start building on Blue why stop? Knock both of those out as part of the same project, and then Blue Line to Waltham/Orange Line to Reading stops looking so crazy.
That having been said, nothing can happen until we start with something. I like the idea of reducing the number of stops on non-D Green Line branches, and as long as we're consolidating stops, why not consolidate Reservoir/Cleveland Circle? They're close enough together that you'd really only need to build a larger station on top of the yard they have there now. You pick up a C-to-D connection, clear the way to keep that yard in use for both LRV and HRV Green Line stock, assuming that we can't convert all the branches.
I'd also like to see a study assessing how doable B branch heavy rail is. I imagine it starts looking a whole lot better when you start axing stations?
That having been said, nothing can happen until we start with something. I like the idea of reducing the number of stops on non-D Green Line branches, and as long as we're consolidating stops, why not consolidate Reservoir/Cleveland Circle? They're close enough together that you'd really only need to build a larger station on top of the yard they have there now. You pick up a C-to-D connection, clear the way to keep that yard in use for both LRV and HRV Green Line stock, assuming that we can't convert all the branches.
I'd also like to see a study assessing how doable B branch heavy rail is. I imagine it starts looking a whole lot better when you start axing stations?