RandomWalk
Senior Member
- Joined
- Feb 2, 2014
- Messages
- 3,073
- Reaction score
- 4,334
Re: South Station Tower
Ugly.
Ugly.
this was written years ago looks like they got there wishI think it needs to be a lil bit fatter and they have to get rid of the spire. It's hideous.
and the Pharos of the Pièce de résistance [my highlight in bold]The southern end of the Phase 1 building has become dramatically slender, which will have equal visual impact to commuters and visitors arriving from the south. The visual result of these subtle transformations is that the Phase 1 building is both the terminus to the Greenway, but also the prow of the city’s growth toward the Seaport District and South Boston. .... The former atrium has been filled in with four floors of amenity/retail space for the Project. The result will be a more activated street-wall, humanly scaled and proportioned that will create a vibrant street life during off-peak hours.
The terrace at the interconnecting Sky Street level will continue to create a setback respectful to the height of the Head House, but has been broadened to provide greater opportunity for outdoor activity. The end result on the pedestrian realm will be one of a smaller scale presence that reflects the architectural character of existing buildings in the Leather District. There is also an increased clearance between the Head House and the lobby, improving pedestrian flow and access to daylight, facilitating a direct pedestrian link between the station, the adjacent USPS property and the waterfront.
It serves as a well-tailored terminus of the Rose Kennedy Greenway. The oval form respectfully echoes the curve of the historic South Station Head House. The tower wall will be clad in a lightly reflective glass and the tower top will be gently lit at night, adding another landmark to downtown Boston.
Still alot better looking than the federal reserve bank building behind it.
My question is when will they start building it? Seems to be all this talk from them, but no action.
Correct me if i am wrong but the approval has a time limit that expires next spring so watch for construction to begin fast on this one . Is that correct?
Schedule
The redevelopment of the site will proceed generally from the north end of the site to the south end. The Project phases may be constructed during different periods of time.
The Proponent currently estimates that construction of the bus terminal expansion, the ancillary South Station transportation improvements, the next phase of the parking garage and the Phase 1 building will commence in 2017, and will be completed approximately four years after commencement of construction.
Construction of the Phase 2 building is expected to commence within one year after completion of the Phase 1 building, and will be completed approximately two years after commencement of construction.
Construction of the Phase 3 building is expected to commence within one year after completion of the Phase 2 building, and will be completed approximately two years after commencement of construction.
However, the schedule may be expedited or extended depending on market forces.
No way you really dont like that? I love that building, its a 1 of a kind, unique to Boston, and looks very cool. Thats fine if you dont but I thought most people did?
Back on topic the older design was about as classy a glass "essentially" box could look. Very high quality glass, great proportions, set backs, the "chic" Boston taper crown, all above South Station. I really hope this new version isn't the final design. That last one was very, very, high quality architecture.