This surprised me too. It looks like Gensler got Phase 2 from TAT. The prior iterations were all TAT. Maybe TAT had Phase 2 for prelim planning and handed it off to Gensler for SD?Was Gensler always on Phase II, or did TAC get sacked?
I'm also having trouble figuring out what Lansdowne Station egress looks like when Phase 1 is completed. They shut down and demolished the old (2014!) stairs from each platform to Beacon Street in December 2018. I can't tell whether the westernmost side of each platform will have secondary egress up to Beacon Street, or if passengers alighting at Lansdowne will have to use the station's central stair/elevator towers to access the new deck and thence Beacon. Some of the plans make me think the outbound platform has secondary egress but not the inbound platform, and some of the plans make me think that neither platform will have stairs anywhere near where they used to be on the Beacon side. Can anyone figure out the answer?
IMG_8130 by Bos Beeline, on Flickr
IMG_8137 by Bos Beeline, on Flickr
IMG_8139 by Bos Beeline, on Flickr
IMG_8145 by Bos Beeline, on Flickr
IMG_8147 by Bos Beeline, on Flickr
IMG_8144 by Bos Beeline, on Flickr
IMG_8148 by Bos Beeline, on Flickr
IMG_8150 by Bos Beeline, on Flickr
IMG_8157 by Bos Beeline, on Flickr
IMG_8154 by Bos Beeline, on Flickr
IMG_8158 by Bos Beeline, on Flickr
IMG_8160 by Bos Beeline, on Flickr
IMG_8168 by Bos Beeline, on Flickr
IMG_8161 by Bos Beeline, on Flickr
IMG_8184 by Bos Beeline, on Flickr
IMG_8187 by Bos Beeline, on Flickr
IMG_8191 by Bos Beeline, on Flickr
IMG_8194 by Bos Beeline, on Flickr
IMG_8196 by Bos Beeline, on Flickr
IMG_8197 by Bos Beeline, on Flickr
IMG_8198 by Bos Beeline, on Flickr
IMG_8204 by Bos Beeline, on Flickr
IMG_8200 by Bos Beeline, on Flickr
IMG_8199 by Bos Beeline, on Flickr
IMG_8202 by Bos Beeline, on FlickrCase example of how NOT to VE your building.Gotta love that cladding vomit!
Gotta love that cladding vomit!