It was the Benjamin /Via sales office got pulled I think last Friday and slapped back together in the parking lot the equinox temp building is being pulled soon because the gym is now open.
W/S I am told owns that lot now and they might have a use for this but I don't believe it is silverline...
Re: General Electric HQ | 244-284 A Street | Fort Point
That isn't even close to Mars!
From 3.5.4 Signage
The New Building is envisioned to have a large GE Monogram on its roof which will be approximately 30 feet by 30 feet in size and will sit on top of the mechanical penthouse of the...
Let's further Clarify Skanska Civil does self perform work and are doing the digging.
The Developer is Skanska Commercial Development and the CM is Skanska Building.
By the way
Skanska building does self perform some trades in other US markets but given the union environment in the Northeast...
Re: Innovation Dist. / South Boston Seaport
I noticed yesterday morning that there is no tower crane in this area for the first time in a while. The one at Watermark Seaport came down over the weekend.
I think that there will be 3 new ones soon at the JMA site over by the Whiskey.
Seamus is JMA the CM on this or were they replaced? Their ghetto behind the white building with the skrim is all gone and cleaned up, Maybe they can run this out of the 300 Mass Ave site office.
I was walking past the site on Main street on Monday and noticed all the temp covers over the columns (seen in the 2 above pictures) have been cut back to expose the top of steel. Yesterday they had trashbags duct taped over the columns. A sign something is moving forward?
I walk past daily so I...
Re: Innovation Dist. / South Boston Seaport
Coming in on the commuter boat I also noticed behind the Oak Hill a stack of sheet pile and a sheet pile driver on that open lot. There are also a number of J Derenzo pieces of equipment on site. There appeared to be a groundbreaking tent out there a...
"Topping Off" is scheduled for Friday the white painted beams are across the street for the Novartis employees to sign them.
1 point of clarification it is a one level bridge between the 6th floors
Re: Novartis Expansion
There are actually 3 levels of bracing some places.
I heard it said that the amount of temporary steel in the hole is about 100 tons less than the total steel that will be used in the northern most tower. Steel erection on this building started about 2 weeks ago.
Also...
Re: Novartis Expansion
Just over 4 acres of excavation is what I was told last week. 2 levels down on half and 3 levels down on the other half. There is a tri-gen plant going into this project soon I believe in the 2 level area.