I could see this thing continuing to drag. Usually once the hoist comes down there is quite a bit of work needing to be done to finish off the infill but it would depend if they were units or other spaces. Realistically all that work will need to be complete prior to any final sign off by the...
Re: SBWTC /South Boston Waterfront Transportation Center/Seaport/ S Boston
Hayward Baker is installing mini piles on the site of Waterside Place 1B in preparation of the SBWTC Garage connecting ramp.
Without digging into it my best guess is the trailers are for the concrete contractor. The trailer will be there until the building tops out as they will be there until the building tops out. There was a similar set up on 30 Dalton if I recall correctly..
Re: South Station Tower
I am not very involved with this project but I do know there is more foundation work than what is already in place. It is my understanding there will be approximately 12 months of enabling, excavation, and foundation work ahead of tower erection.
Re: SBWTC /South Boston Waterfront Transportation Center/Seaport/ S Boston
From 2/14 - Piles/Foundation work still ongoing. New drilling rig on site working the north side of the site.
Re: Waterside Place 1B | 505 Congress Street | Seaport
Work ongoing at the site is for SBWTC enabling. WSPII will not start until the Massport work has been completed.
Re: SBWTC /South Boston Waterfront Transportation Center/Seaport/ S Boston
Here are a couple random shot renders I was able to find. These are from earlier this year so not 100% if they still fully reflect the final design.