Not sure if serious? It cost the state 2.3 billion to build a 4.3 mile surface trolley extension on an existing ROW. The cost to fill in the Cape Cod Canal (17 miles) would be in the multiple, multiple billions of dollars considering the volume of material, labor, equipment, environmental...