121 Seaport Boulevard | Parcel L2 | Seaport Square

They stopped steel to focus on some foundation issues which seemed to take 3-4 weeks
 
This is going to end up being the ultimate "damn, this would have been so much better with 10 more floors" project even though more height wasn't possible here.
 
From 2/14/2017

lUUTreDl.jpg
 
That glass and light blueish paneling/glazing reminds of the Ritz Towers' first few floors where the gym and movie theater are.
 
They never render all the big rigs hauling containers to conley....
 
They never render all the big rigs hauling containers to conley....

They've got to do something about this. All of the trucks are out of control on Seaport Blvd.

This project is almost there...Looks like 1 more floor of steel. Glass going up on floors 1-2 now.
 
They've got to do something about this. All of the trucks are out of control on Seaport Blvd.

This project is almost there...Looks like 1 more floor of steel. Glass going up on floors 1-2 now.

What should they do about them?
 
^Yes, they could easily force them to divert all truck traffic onto the Haul Rd. Hopefully that will be instigated by someone or some group soon.
 

Back
Top