Lots G & H / 26 October 2020
Lot G's work continues on the rooftop HVAC (and other) systems. The anticipated continued late night cladding work has stalled (maybe a materials delay), although other site work begins before 0700 daily.
Lot H steelworkers positioned the first beams for the eleventh floor today
As you can see, I don't have a line of sight to Lot EF (behind Philips/JK), but the last time I walked back there they were adding steel on the sixth floor.