Not sure if serious? It cost the state 2.3 billion to build a 4.3 mile surface trolley extension on an existing ROW. The cost to fill in the Cape Cod Canal (17 miles) would be in the multiple, multiple billions of dollars considering the volume of material, labor, equipment, environmental impact, and legal requirements. Not to mention decades of delays due to the need for an act of Congress to allow it, and the ensuing litigation to prevent it.It would be pretty cheap to just fill it in.