The Brittanic never called at Boston during its brief career as a hospital ship.
I'd assume either Olympic or Brittanic in that photo too. Pretty neat
All that rail access out to Fan Pier is amazing. Now the viaduct makes sense!Actually, I did find ONE photo where some part of the structure might be original, but it's VERY hard to tell. The overhead structure does not seem to be on the other side of the building from old photos.
View attachment 34989
View attachment 34990
What a view! Love that runway! St. Regis I assume?
from what I understand fit out work completes late 2024 with occupancy very early in 2025.Anyone have a guess as to if this is still on track? From the start, this was set up to be a 4-year long project. Not sure I was expecting this much more facade work 3 years in...
Anyone have a guess as to if this is still on track? From the start, this was set up to be a 4-year long project. Not sure I was expecting this much more facade work 3 years in...
I'm gonna guess Covid delays plus materials supply chain?
I think they've decided to finish the project using volunteer labor on weekends with building supplies donated by Home Depot.Anyone have a guess as to if this is still on track? From the start, this was set up to be a 4-year long project. Not sure I was expecting this much more facade work 3 years in...
Is that brickwork in the second floor windows permanent? A shame if it is.
It looks like the brick will stay but be covered by stone veneer, and the current holes in the brickwork will provide space for the large flag holders.Of course not. Heres what its going to look like straight from the website.