The One Dalton/Suffolk team should be embarrassed that they can't close up those 7 panels of glass. And equally embarrassed that the sidewalk on Dalton still isn't anywhere close to being done.
I think they're replacing some other cracked windows on the building before the plywood which may be part of the delay. But it's getting RIDICULOUS.
I think they're replacing some other cracked windows on the building before the plywood which may be part of the delay. But it's getting RIDICULOUS.
IMG_1272
IMG_1280
IMG_1287_2
IMG_1293
IMG_1327
IMG_1335
IMG_1339
IMG_1355
IMG_1365
IMG_1382
IMG_1383
IMG_6057
IMG_6060
IMG_6035
IMG_6054
IMG_1433
IMG_1437
IMG_1456
IMG_1459
IMG_1478
IMG_1484
IMG_1554
IMG_1555
IMG_1576
IMG_1616
IMG_1617
IMG_1624
IMG_1630
IMG_1631
IMG_1632
IMG_1633
IMG_1636
IMG_1637
IMG_1703
IMG_1707
IMG_7583