It's time for the Government Center Station project to have its own thread as pre-construction work begins and the station shuts for 2 years or so
It's time for the Government Center Station project to have its own thread as pre-construction work begins and the station shuts for 2 years or so
Good Idea. I suspect we'll learn a lot about the system from how people adapt. Project details are here:
MBTA Gov Center Rebuild Page
I know the closing is less than ideal, but I hate when outfits like Dig Boston flip their collective shit about it like it came out of nowhere. IT WAS ANNOUNCED TWO YEARS AGO.
I know the closing is less than ideal, but I hate when outfits like Dig Boston flip their collective shit about it like it came out of nowhere. IT WAS ANNOUNCED TWO YEARS AGO.
Agreed, I see a lot of coverage that suggests this was not announced and not thought out.
Just because there are ignorant people who don't read anything does not mean that this was not very public, and carefully thought out. The reduction from three to two years is a great example of the degree of planning that is going into this.
I still think they could have reopened the Blue only egress and added fare-gates so that Blue commuters could still use the station. As far as I know, there is zero work being done on the Blue level.
Stairs are all being ripped out/relocated and elevators (bank of 2 for redundancy) are being added down to the platform.
I still think they could have reopened the Blue only egress and added fare-gates so that Blue commuters could still use the station
Ah. Oh well. I look forward to seeing how the system adapts to losing one of the "big four" stations. Are B and C trains looping at Park Street or North Station?
During Government Center's closure, Green Line trains will pass through Government Center Station but not stop there. The last downtown stop will generally be the following for each branch:
• B Branch (Boston College) will end at Park Street
• C Branch (Cleveland Circle) will end at North Station
• D Branch (Riverside) will end at Park Street during rush hours and North Station at other times
• E Branch will end at Lechmere
Additionally, Bowdoin Station will extend its operating hours and will be open during all hours of service for the duration of Government Center's closure.
Here's a question posed to the board:
Government Center is closed due to the rebuild. You do not have a monthly MBTA pass, or a Hubway membership (could get you part of the way). It is 5:15 pm on a Friday. You are standing at the corner of Arlington & Boylston in Back Bay. You want to get to Maverick Square in East Boston. What do you do? I can think of a few options, but I'd like to hear your opinions.