- Joined
- Sep 15, 2010
- Messages
- 8,894
- Reaction score
- 271
If this had been built, it's highly likely that the big dig would have entailed tearing down the central artery and simply replacing it with a boulevard a good 15 years sooner than it happened in real life. There still would have been functional highways reaching downtown, but they simply would have ended at the location of the tunnel reaching the surface and the current location of the Zakim bridge.
Then the big dig would have buried the inner belt, leaving the area as a whole with much better transportation access-- it wouldn't take me 45 minutes to get from cleveland circle to Tufts on a saturday afternoon
The idea of burying the already aging CA was indeed present in a lot of the plans for the highway improvements I looked through.