2018-2023 was the original delivery target for all Orange and Red cars.* Delivery schedule extended so many times that we cannot even remember the original due date
2018-2023 was the original delivery target for all Orange and Red cars.* Delivery schedule extended so many times that we cannot even remember the original due date
In that case wouldn’t that mean that CRRC would demand more money from the T to cover the new Trump tariffs? The T is going to have to blow up the cost of the new rail cars and pony up extra cash to finish the Red Line order even with the fiscal cliff.Restarting the procurement would probably cost more than the tariff itself. And who knows, maybe a deal can be cut with the GOP for train imports, as long as someone gets paid the right money.
$55M of the $148M increase in the last CRRC contract revision from May was already a tariffs adjustment. This isn't a new thing in the slightest. To even establish bounds for a future increase, you first have to determine how many cars are paid for by January 20 at the earliest (or considerably later...since tariffs aren't going to be a Day 1 thing with the jurisdiction of how much an Admin. can act alone without Congress being a thorough legal/logistical mess largely untested at the scope of these theoretical tariffs). Not how many cars are accepted for service, not how many are delivered on MBTA property...how many are paid for. They could be paying for them midpoint in assembly or in installments before the cars are even shipped from China, for all we know. Unless you can cite the payment schedule from the contract fine print, you don't know how much of an issue this really is.In that case wouldn’t that mean that CRRC would demand more money from the T to cover the new Trump tariffs? The T is going to have to blow up the cost of the new rail cars and pony up extra cash to finish the Red Line order even with the fiscal cliff.
Brookville Equipment Corp. is the last solely U.S.-based rolling stock company, and they only do small orders of LRV's and locomotives. Wabtec is also here if you're strictly talking diesel locomotives, as they're the overwhelming worldwide market leader there. All HRT/metro cars are foreign-sourced. But the tariffs are being targeted at the Chinese...so CRRC being the only Chinese rolling stock maker with active U.S. contracts is the literal only one in the crosshairs, and they're almost done with their other two active U.S. orders and well on their way to exiting the domestic market after all their delivery failures. It's a real reach to conclude that this is somehow a credible vector to "get rid of transit", because it's basically not going to disrupt anyone's buying plans but the MBTA's. Purely theoretically. Again...depending on whether the legal authority even exists to unilaterally impose those intended tariffs without the input of a Congress that intends (per Sen. McConnell today) to still have an intact Senate filibuster.Also, do we even have any domestic passenger train production by domestic US companies at all? If the answer is no, then the tariffs are just one way for Agenda 47 to get rid of transit from the US altogether.
Wise words.Delvin...I know given your posting history that you physically can't help yourself with the incessant doomscrolling. But is this really a productive endeavor to be heaping it all over aB today when you don't have anywhere close to enough of the pertinent facts handy to foretell the doom? Breathe, damnit.
MBTA spokesperson Joe Pesaturo told StreetsblogMASS that "32 new Red Line cars have been delivered to date, 20 of which are currently available for service. The other 12 are in varying stages of the inspection, testing and acceptance process.”
It's already fixed.Word is out that the MBTA has recently said that there's another 500-foot long slow zone on the Red Line just days after having previously said that the line was slow-zone free!! What gives?!!![]()
![]()
The four 01400 work cars were stored at Codman Yard out-of-service for close to a decade, then were recently moved to Cabot Yard to be prepped for scrap. They'll be gone very soon.Someone had recently posted this pic on Facebook. I thought that the old Red Line Pullmans were gone several years ago!!!!![]()
View attachment 58705
Thanks. But it's a downright shame & so stupid how the MBTA keeps dinosaur equipment around for so long, knowing that far better & up-to-date tecnology can be gained with new equipment. Sad. So sad.The four 01400 work cars were stored at Codman Yard out-of-service for close to a decade, then were recently moved to Cabot Yard to be prepped for scrap. They'll be gone very soon.
Dude...they were work cars. They went around on the overnight picking up trash and transporting track gangs and their equipment. Dirty work. You don't use state-of-the-art revenue equipment for jobs like that. You use retired old beaters, because they're gonna get beat up doing dirty work.Thanks. But it's a downright shame & so stupid how the MBTA keeps dinosaur equipment around for so long, knowing that far better & up-to-date tecnology can be gained with new equipment. Sad. So sad.![]()
Speaking of work cars ... The T ordered several purpose built sets of work cars in 2021 - one "crane train" each for Red, Orange, & Blue as well as a pair of wire trains for Green and Blue. Per NE transit, they were supposed to be on property by now - the crane cars in 2023-24, and wire cars 24-25. One would tend to assume that they'd have been very helpful in getting, and now keeping the system slow zone free.Dude...they were work cars. They went around on the overnight picking up trash and transporting track gangs and their equipment. Dirty work. You don't use state-of-the-art revenue equipment for jobs like that. You use retired old beaters, because they're gonna get beat up doing dirty work.
Green Line just got 3 Type 7 conversion work cars added to the roster: Maintenance of Way car 3615, Re-railer car 3669, and Track Geometry car 3680. They aren't officially in-service yet, but just came out of the shop from their conversions. They replace 3 Boeings of same work roles that were scrapped a few years ago after rotting out-of-service for awhile. It matters a lot how maintainable they are. The GL Boeing work cars were maintenance nightmares because the whole Boeing platform was a maintenance nightmare, and parts weren't available for years so whenever something broke they had to scavenge one extra donor-body Boeing they kept lying around. Didn't end up being enough to keep them running. The MOW car was out-of-service for over 10 years. The re-railer car had shot propulsion and had to be dead-towed around by a Type 7 from the revenue fleet in its final years. Both the MOW car and the re-railer never underwent midlife rebuild like the rest of the fleet...they were converted instead of being rebuilt. And the Geo car only lasted a handful of years after its post-retirement conversion because its propulsion too broke down and the parts were gone. The Type 7's all have freshly rebuilt systems, and a parts warehouse that's stocked full...so the new converts should be good for 20+ years of work service.Speaking of work cars ... The T ordered several purpose built sets of work cars in 2021 - one "crane train" each for Red, Orange, & Blue as well as a pair of wire trains for Green and Blue. Per NE transit, they were supposed to be on property by now - the crane cars in 2023-24, and wire cars 24-25. One would tend to assume that they'd have been very helpful in getting, and now keeping the system slow zone free.
Are delays in getting these affecting the Ts ability to maintain the system? The 1400 works motors are scrapheap bound, they didn't keep a single pair of OL 1200s and given that the GL wire car had been out of service for a while by the time the FTA came knocking in 2022... I assume the rest of the existing work car fleet isn't far behind in decrepitude, especially since they'd ordered the new ones even before the FTA SMI. Presumably the T was relying on contractors and their HiRails during this year's track improvement project, but going into next year does the T have enough of their own HiRails / tools to do the job of "keep up" without relying on contractor equipment?