IMG_4314 by Bos Beeline, on FlickrHas the facade work stalled on this? Or am I off?
The upgrades to the office tower will include the replacement of the existing façade with a glass curtainwall from the ground level to level 30, an overclad system between levels 31 and 38,along with the addition of mid-level and roof level attractions, and the addition of infill areas below existing cantilevered corners.
Did anyone catch this in the PNF (2018):
Maybe (hopefully) plans have changed since then, but perhaps the delay we're seeing is due to the transition in method between full facade removal and the region where the existing facade will remain under a new over-clad. However, perhaps things have changed due to the pandemic, since the document also mentions preserving occupancy for tenants in the overcladded region. For instance, if the tenants instead vacated and the developer since decided to replace the entire facade, maybe there's been a delay due to needing to change the order for facade materials.
It looks like from this picture by DZH22 that the structure fore the over clad is already in place. So I wouldn't expect them to change designs at this point.