czsz Senior Member Joined Jan 12, 2007 Messages 6,043 Reaction score 6 Aug 18, 2010 #81 ^ Very Tokyo, actually. Down to the telephone wires.
Boston02124 Senior Member Joined Sep 6, 2007 Messages 6,871 Reaction score 6,424 Aug 18, 2010 #82 Today, things r starting to happen! but what?
R Ron Newman Senior Member Joined May 30, 2006 Messages 8,395 Reaction score 12 Aug 19, 2010 #83 IKEA foundation pouring?
B blade_bltz Active Member Joined Jul 9, 2006 Messages 808 Reaction score 0 Aug 19, 2010 #84 ^ Highly doubtful. I think they're working Assembly Square Drive. A road.
Boston02124 Senior Member Joined Sep 6, 2007 Messages 6,871 Reaction score 6,424 Aug 19, 2010 #85 I was there again this morning ,looked like they're paveing a parking lot
BeeLine Moderator Staff member Joined Jan 7, 2012 Messages 13,982 Reaction score 22,089 Nov 7, 2012 #86 Not sure this is the correct thread, but I tought it might be of interest. This is the new Self-Storage building being built at 50 Middlesex Ave next to I93N and about two blocks from Assembly Row. http://www.somervillema.gov/sites/default/files/documents/old_rnd/Design approach Middlesex.pdf I took this photo of the site yesterday. 50 Middlesex Ave
Not sure this is the correct thread, but I tought it might be of interest. This is the new Self-Storage building being built at 50 Middlesex Ave next to I93N and about two blocks from Assembly Row. http://www.somervillema.gov/sites/default/files/documents/old_rnd/Design approach Middlesex.pdf I took this photo of the site yesterday. 50 Middlesex Ave
BostonUrbEx Senior Member Joined Mar 13, 2010 Messages 4,340 Reaction score 128 Nov 7, 2012 #87 I hope they remember to take the tractor trailer out of the building before they finish up and build the walls.
I hope they remember to take the tractor trailer out of the building before they finish up and build the walls.