kz1000ps
Senior Member
- Joined
- May 28, 2006
- Messages
- 8,827
- Reaction score
- 10,331
Re: NorthPoint Cambridge (The one that was train yards, the big plan.)
No idea how much this is a factor but with this method the concrete and iron (aka steel) workers aren't on site at the same time which I'd imagine simplifies logistics somewhat.
No idea how much this is a factor but with this method the concrete and iron (aka steel) workers aren't on site at the same time which I'd imagine simplifies logistics somewhat.