Wentworth Institute of Technology Expansion | Fenway

It's not terrible -- it's just shortsighted if the institute is looking for redevelopment opportunity. Perhaps the most prominent location on campus, you would imagine they'd want to utilize this space to it's fullest potential.
 
I highly recommend that anyone passing by the MFA area to stop into the lobby of Wentworth Hall to view all of WIT's new master plan buildings and the revised master plan itself. They have new renderings of the Beatty expansion, the Ira Allen atrium, the new res hall at 525 Huntington Ave, and the new Sweeney Field on Parker St.

http://maps.google.com/maps?f=q&sou...036,-71.094149&spn=0.002407,0.006089&t=h&z=18
 
If Sweeney Field is to be relocated, what will that site be used for? Could they be considering selling it to.......Northeastern?
 
If Sweeney Field is to be relocated, what will that site be used for? Could they be considering selling it to.......Northeastern?

No no no. Never. That site was planned to be developed into an academic building as part of the first IMP, but it has been categorized as "Potential Future Development" in the most recent IMP.

Btw guys, Beatty starts May 16!! Parts will open and close in phases over the next 2 years.
 
Hey guys, Beatty and Ira Allen are well underway now!

Beatty (Flannigan Campus Center): Prelim sitework/interior demo. Front stairs are FINALLY being removed next week!!
Beatty Webcam

Ira Allen (Center for Sciences and Biomedical Engineering): Pile driving phase, with the interior completely gutted. Elevator removed.
Ira Allen Webcam

Ira Allen Project Update said:
Keep an eye on the Ira Allen job site for these upcoming milestones:

· Pile driving to continue
· Site utilities
· Basement level slab removal
· Interior demolition

Please check our website for updates and additional project information
http://myweb.wit.edu/planning_const/development/Active jobs/Ira Allen.htm

And find us on Facebook to keep in touch as well
http://www.facebook.com/IraAllenProject
 
Last edited:
Beatty!! (These should bring a smile to your face, Van!)

Held my phone over the fence, stairs are GONE!!!!:
2011-08-05_09-54-20_867.jpg


Front wall of one of the group study rooms in the library has been torn out:
2011-08-05_09-54-42_896.jpg


I've always loved the coffered ceilings:
2011-08-05_09-55-04_715.jpg


Next one just came down!
284145_10150749212280454_796940453_20068889_5282674_n.jpg
 
Last edited:
Ha! You know I saw the picture before your comment and I actually did smile :) .

What are they doing again? It's been so long since I've seen a rendering.
 
Ira Allen (Center for Sciences and Biomedical Engineering) is really getting cool now:

Conc. formwork
299851_262514877105257_183207238369355_797698_902934235_n.jpg


Steel rebar
317524_262514943771917_183207238369355_797700_1074469439_n.jpg


3rd fl ductwork
300931_262515003771911_183207238369355_797702_538846291_n.jpg


Conc. formwork
309786_262515053771906_183207238369355_797704_1948331671_n.jpg


Basement slab pour
254682_252208288135916_183207238369355_766116_299495_n.jpg


3rd fl ductwork
313209_252208331469245_183207238369355_766117_5936500_n.jpg


Pile cap formwork
306721_252208381469240_183207238369355_766118_621612_n.jpg


Pile cap formwork
300511_252208431469235_183207238369355_766119_2790074_n.jpg


Completed pilecaps
315050_252208471469231_183207238369355_766120_3654388_n.jpg
 
Why does every building have to look like an Apple Store now? Ugh.
 
Also of note is that since Ira Allen and some of Beatty are unable to be used, Wentworth is holding classes in the Greek Orthodox Church on Parker St (2 rooms) and there's also a massive set of portable classrooms on the (Wentworth Hall) Front Lawn. The portables didn't pass inspection the first time, lol.
 
Beatty!!! (Flanagan Campus Center)

These were taken by the Dean, Annamaria Wenner. The soft-opening of the ground floor of Flanagan is March 12.

432087_622523166840_41901270_32423942_1949424428_n.jpg

417145_622523241690_41901270_32423946_153237057_n.jpg

430700_622523062050_41901270_32423937_1023303554_n.jpg


Looking into the fitness center. No more exposed concrete coffers.
427332_622523201770_41901270_32423943_415113330_n.jpg


New seating area of the new cafeteria.
430188_622523226720_41901270_32423945_1414575251_n.jpg


Badly needed new elevator!
404843_622523126920_41901270_32423941_1417777146_n.jpg
 
I recognize those old bones. Thanks for these.
I love that you can still see the brutalist rhythmic and monolithic structural columns in the new forum that once comprised the old facade. They didn't hide them with any perpendicular drywall.
 
ugh..... sorry, but any architect who exports renderings direct from sketchup can't be trusted to be competent
 
Ira Allen/Center for Sciences and Biomedical Engineering
> Taken by BOND Brothers, posted on the Facebook page.

429546_343678002322277_183207238369355_1040590_1486966002_n.jpg

428196_343678058988938_183207238369355_1040591_1750784496_n.jpg

417049_343678112322266_183207238369355_1040592_1288020987_n.jpg

427708_343678152322262_183207238369355_1040593_425707451_n.jpg

426101_343678202322257_183207238369355_1040594_519366180_n.jpg

395675_343678225655588_183207238369355_1040595_1565813654_n.jpg

427476_343678275655583_183207238369355_1040596_1120031046_n.jpg

421528_343678292322248_183207238369355_1040597_371641958_n.jpg

426467_343678325655578_183207238369355_1040598_692692309_n.jpg
 