I'm not feeling the base. The scale is right but the glass stands out too much. It's not interesting enough to be edgy.
Same as it ever was:
Never believe rumors, especially on the internet.. but..
I heard the glazing subcontractor filed bankruptcy midway through installation, hence the frozen state of this facade.. Berklee/Lee Kennedy are having a hell of a time trying to find someone who will pick up where they left off, and maintain liability etc.
One of the guys told me it's temporary. If you're close enough you can see it's only about 3 ft from the edge of the building. Presumably the dorm rooms (quick to finish) are on the exterior walls and bathrooms, stairs and elevators (longer construction times) are in the windowless interior so they kept working behind this. There are plenty of people coming to the site in the mornings I know that from my walks.
Many of the pink panels arrived over the weekend. A few are on trucks along Mass Ave and two are propped up in the alley closest to St. Cecilia's parish. Interested in how they will look installed.
800 Boylston didn't make it into this rendering, did it.
If I'm not mistaken the grey massing in the center of the picture is a second proposed tower for Berklee. Does anyone know what the story of this building is?
you are correct about that