If we're talking about burying the A branch in the tunnel and building a new subway through Back Bay, at that point, one may as well just send rail transit down the B & A railroad along the Pike... [SNIP]
First off, Welcome @ehamwey it's good to have you here! Second, I combined these two responses for a reason. I've been away from the forum for a while due to having two kids under four so I am a bit out of touch with the pulse here; I don't really understand why this forum (overall) doesn't want to consider replacing the Worcester line inside of 128 with rapid transit like 1945 plan did. I don't agree in the eastern section, @Delvin4519 , with your use of the B&A because the orange line and the commuter rail already have space and that type of tunnel would probably best serve the Huntington tunnel. I could see using a B&A tunnel around Kenmore to replace the B and the C lines, moving Blue line and/or a Comm Ave subway into Kenmore (as it currently stands) and joining the (now) two tunnels with a connection to Landsdowne. I think it was @Riverside who really figured out something that I agree with which is that West Station already exists and its Kenmore and I think he even tried to connect the Grand Junction in as well. To circle back to the A Line: I don't see it's value when we could just replace the Pike stations with rapid transit. You could even go up to West Station, come back down Cambridge Street, and then take North Beacon to the Pike if we should want to include both the new neighborhood, a nod to the A line, and utilize B&A, Utility lite space. Getting CrAzY we can just tunnel under the A from Cambridge street onward and connect back on at or around Newtonville (Which would be great in the same world as Ratmeister's Blue Line to 128).Long time lurker, but first time posting, and absolutely loving the discussion of A branch to Brighton. I use the bike lanes through Brighton Center, down Washington, Brighton Ave and Comm Ave every morning because the 57 is so slow and inconsistent (also since my destination is near Lechmere). I definitely agree that keeping them is a huge win, but consistent high frequency transit on this corridor is a greater need, and bike lane alternatives do exist. [SNIP]
I see three issues I'm trying to solve for:
- - Stop hubbing lines onto the green line.
- Not solved by reinstating the A as is
- The ultimate band-aid for resource starved dreamers.
- -Speed up the Worcester Commuter rail by taking off the intra-128 stops
- An expansion beyond Oak Square?
- -Meaningfully connect an inbound route here to a pathway that goes through the entire peninsula.
That last point is why I don't like a full B&A look. It just terminates? It takes the Congress street alignment away from a more worthy south-westerly direction? All of the ROWs we're discussing here (short the A) either were connected into proto south station or went into the station at the end of Comm ave on the public garden. We already have the B&A to South Station so use the missing ROW on Comm ave. Replace the missing ROW on the B&A west (lost to the pike) to institute frequent local service and make the Worcester line competitive with the highway. It shouldn't take an hour and a half (I'm aware that that isn't the only hurdle). I'm advocating here for a Blue line on the embankment, a new line on comm ave, and separation of the B & C from the D & E.
ehamwey is talking about DMU/EMU service on the B&A inside of 128 but we're also over here still advocating for the Blue line to get to Lynn (SALEM!) so as to separate local need from intercity and regional rail. There should be connections between regional and local service, but the fact that we have a regional service running local stations is not great.
Last edited: