It is hilariously general for roadside variable message signs, but I'd say refreshingly specific and helpful compared to the old school "your tax dollars at work" or the usual Governor/Mayor/Secretary/Board/Engineer list of bigwigs.Saw this on my walk into Union Sq this morning, thought it was hilariously general... "5/2018 to 9/2021"
Saw this on my walk into Union Sq this morning, thought it was hilariously general... "5/2018 to 9/2021"
Is it for both? The wall looks placed to widen the RoW on the Green Line sideI think that’s for the adjacent Somerville High School project.
That's unfortunate, but thanks for the infoDerenzo is not one of the GLX contractors, and it’s on the far side of the service drive at the school.
Is Middlesex a contractor? There's some equipment from them along the Lowell line. In addition, there is a bunch of equipment that has a temporary white plastic "GLX Constructors" sign on them, with a symbol of a green line car and everything; still not sure what company they're from, I'll try to pick it out one of these days. I'd say they've commenced on ROW clearing and some preliminary grade work, at least...
I dont remember hearing about extending the green line on the other end down south huntington to centre st. Anyone know whats up with this?
https://www.youtube.com/watch?v=v00qSzU8cnU
Can't watch the video yet, but I thought that was in the City of Boston's 2030 plan?
I dont remember hearing about extending the green line on the other end down south huntington to centre st. Anyone know whats up with this?
https://www.youtube.com/watch?v=v00qSzU8cnU