The platform is half poured. The tented portion isn’t poured yet, so they’re protecting the rebar from the snow.
I'm pretty sure snow doesn't affect progress that much, other than taking the time to clear it. What's more of a problem is when the ground freezes.
What project work can take place while there's snow on the ground? Have there been any electrical/signaling systems put in yet that could be tested?
Yes, the connection is through a new Lechmere Station in Cambridge Crossing, then onto the viaduct to Science Park, North Station, etc.I think that I'm lost, but where on earth will this extention connect in town? Will it be from between North Station & Science Park? The same way as when it was just to Lechmere?
I think that I'm lost, but where on earth will this extention connect to in town? Will it be from between North Station & Science Park? The same way as when it was just to Lechmere?
Yes, all new stations in the northward extension including a new Lechmere Station.Thanks, everyone!!
So, going outbound, all the stops will be brand new, includingthe rebuilt Lechmere Station, right?!!
Thanks, everyone!!
So, going outbound, all the stops will be brand new, includingthe rebuilt Lechmere Station, right?!!
Pretty good, though not for another decade or so. F-Line has a great series of posts on the Crazy Transit Pitches thread showing his layout for the extension via Porter Square all the way to Watertown Square at http://archboston.com/community/threads/crazy-transit-pitches.3664/post-388462I haven't actually seen a map of it all before, and it's just dawning on me that they're making two lines lines out of it.
What are the chances of them continuing the line from Union up to Porter eventually?
That's the first I had seen it in any context! A sweet viewpoint from the top of the MOS!Has anyone posted this live cam link re: the Viaduct yet?