HelloBostonHi
Senior Member
- Joined
- Apr 17, 2018
- Messages
- 1,426
- Reaction score
- 3,717
That is specifically required in new construction by the T https://cdn.mbta.com/sites/default/files/2022-01/2022-01-24-design-guideline-paess.docxThere should be a countdown board at the station entrances so folks don’t have to go all the way down to the platform to see there’s a 20min wait.