Marriott Moxy Hotel | 240 Tremont Street (Parcel P-7A) | Theater District

Love to see renders of this from the common...anyone?
 
Oh wow this is flying. Stuart streets really coming into its own as its own corridor.
 
Glass is being installed I’ll post a pic later if someone don’t beat me to it
 
Thanks for getting over there, I actually was over in that area and completely forgot. I'll take a look in person today, but from your pictures the glass looks pretty good.
 
Looks like it'll end up being a smaller twin tower of the W. Will be a nice effect on both sides of the street.
 
Looks like it's transitioning the load to allow for the cantilever over the sidewalk.

Yes, the concrete is transitioning the load, I was wondering about the steel framing at the corner?
 
Yes, the concrete is transitioning the load, I was wondering about the steel framing at the corner?

I believe that's for the large advertisement(?) screen that will wrap that corner.
 
My first job was at the Gary Theater, 133 Stuart Street. The site is now part of the Transportation building. I worked there for three years starting in 1968. It was a funky neighborhood back then and still has a bit of funk left despite all the new construction.
 

Back
Top