I hope that the City of Somerville charges the T for these boarding islands. It would only be fair.Ironically, the construction included bus boarding islands on Summer Street, which will now go unused.
I hope that the City of Somerville charges the T for these boarding islands. It would only be fair.Ironically, the construction included bus boarding islands on Summer Street, which will now go unused.
But the t would be upset that they wouldn't have inaccessible stops if the 85 stayed longer than expected or if it was kept in because of the neighborhood resistance.The cut was already planned by May 2022. It's strange that Somerville still constructed the islands well after that.
Quincy would need about 100 to maintain existing service with BEB's. The rest of the space is for service expansion. The T's still got 340 un-exercised options on the 40-footer BEB contract, most of which are earmarked to populate the new Arborway and Medford garages but which at least 100 buses appear to be slush options to spread around the system. So we'll probably see another small tack-on in the coming months to buff out Quincy further.The garage is supposedly big enough for 120 buses:
Perhaps the 88 is just sufficient for existing service?
nyc.streetsblog.org
The number of drivers caught blocking bus stops along the 50 bus routes with Automated Camera Enforcement, which insiders call "ACE," has dropped 40 percent after the MTA turned on the cameras [in June 2024], with another four routes coming online last Friday.
It's a soft launch with only a couple of buses participating, because these are being run out of Charlestown garage which only has a couple electric charging bays installed for the testing of the fleet. They're saving the 4200's for the full service launch which will come with the service change back to the lower busway, since until then there's no use for the left-hand doors. There's been 5 4200's and 5 4300's testing at Charlestown, Cabot, and Southampton for a few months now per NETransit, and an unspecified number of additional deliveries have also taken place. They need to get reps in cold weather to test the charging cycles in weather extremes (which the temps in the upcoming forecast will certainly challenge). Hopefully the newest-generation XE40's fare better than the 5 Silver Line XE60 BEB's from 2019 which haven't run at all in a month-and-a-half in a not-particularly-good omen for the tech.Per Reddit, the T has quietly put at least one of the new battery-electric buses into revenue service. The one in the post is one of the 4300-series buses ultimately destined for the new Quincy Garage, not one of the 4200-series with left-side doors for the Harvard tunnel. I imagine there will be much more fanfare when the renovated North Cambridge facility opens and the new buses take over base service on the 71 and 73.
While I still think shutting down the trolleybus network and ripping out much of the infrastructure was a huge mistake, I'm glad to see the T making good on its promise to replace them with electric vehicles (albeit with diesel heaters for very cold weather), even if it's two years late. The left-hand door buses will also significantly speed up outbound trips on the 71/73 since they'll be able to go back to boarding in the lower busway and riders will no longer have to loop back through Harvard Square on the surface. (It would also be nice to get more buses with left-side doors for the 66 and 86 so those routes could also board in the lower busway.)
Why not a center-running busway? The Sullivan Sq underpass does pop up in the center of the street just south of the Alford St bridge, but that should not preclude a center-running busway. In any case, at least the project schedule looks fairly aggressive, and the project will provide bus lanes for the SL-3 to be extended to Sullivan Sq., and also provide improved bus service for a future Revs stadium.Lower Broadway – Alford Street Transit Priority Corridor | Projects | MBTA
Official website of the MBTA -- schedules, maps, and fare information for Greater Boston's public transportation system, including subway, commuter rail, bus routes, and boat lines.www.mbta.com
Side running busway
I would expect that it's because the station is on the west/north side of the underpass so it might tie in better on that side of the street? I don't see how the work the northern end of things tho.Why not a center-running busway? The Sullivan Sq underpass does pop up in the center of the street just south of the Alford St bridge, but that should not preclude a center-running busway. In any case, at least the project schedule looks fairly aggressive, and the project will provide bus lanes for the SL-3 to be extended to Sullivan Sq., and also provide improved bus service for a future Revs stadium.