Some incredible shots inside and out of the tower here.
https://www.youtube.com/watch?v=ZNaws6vHqiA
https://youtu.be/ZNaws6vHqiA
still havent figured out how to embed youtube videos here so the link is above.
Regarding the open top of this building...if we are going to have more of these open root canal type crowns, then the developers should be required to "dress" the first 6 or 8 feet on the inside down from the inner rim so that one doesn't have a view of the 2 x 4's.
^agreed
also, they should replace the traditional window washing roof crane with this:
bring your own squeegee
From today:
Woonerf:
I'm still under the impression that this is going to be mostly enclosed, with an opening for the window-washing crane.
Is there anything to support this? Know a guy who knows a guy who works on the tower, saw a blueprint, heard a BRA employee mention this this 1 time.... Im interested to see if this happens too. I hope it does I would just think that there would be bracing up by now, a cladding delivery waiting on a pallet, or something along those lines. Nothing seems like it to me, but I hope they sneak it in there one of these days because this tower is amazing from everywhere but from the south bay area it seems like it will always appear unfinished.