They are starting to remove the yellow screening. Must be topped out.
Yup, theres 5 total floors above the last setback, two occupiable floors for the penthouse and 3 mech floors. The final concrete floor would be the first mech floor and then there will be two floors of steel/facade for the final two mech floors.
View attachment 52557
View attachment 52561