Anyways its just crazy that besides the glx using existing ROWs theres really nothing else going on. There has to be more were capable of we cant just build and build and ignore expanding transit even if the numbers may not be fun right now. We either grow it or car traffic will grind the city to a halt.
Not much going on except for 40% and 50% capacity improvements on both the Red and Orange lines, serious contemplation and study of redoing the green line with all low floor vehicles (leading to capacity increases), Silver Line out to Chelsea completed, and a whole bunch of other things like transit signal priority, Charlie Card 2.0, etc.
I do agree, though, that we desperately also need a whole bunch of other projects/real expansions to be done, though. Red/Blue, Urban Ring, Regional Rail, Needham Line converted to rapid transit, Blue to Lynn, etc.