HelloBostonHi
Senior Member
- Joined
- Apr 17, 2018
- Messages
- 1,426
- Reaction score
- 3,717
bonus train photo
Some curved units finally ready to go in on the North elevation
View attachment 24564
View attachment 24565
Different kind of glass going in on the bottom right of the building. You can also see the plaza has been closed off and the temporary handicap accessible ramp has been removed. View attachment 24672
It resembles a corrugated aluminum box culvert, but it is unique and striking in its appearance. Overall, I like it.
The short answer is a lot. This has what it would guess to be a lot of additional scope cross a few trades which adds complexity and cost in addition to just material costs, not to mention coordination on the design team and contractor (I wonder what the shop drawings are like?). I'd WAG at least 30 percent more over a simple glass box but wouldn't be surprised if it was higher.How much more expensive is a facade like this compared to ordinary commercial real estate buildings?
The short answer is a lot. This has what it would guess to be a lot of additional scope cross a few trades which adds complexity and cost in addition to just material costs, not to mention coordination on the design team and contractor (I wonder what the shop drawings are like?). I'd WAG at least 30 percent more over a simple glass box but wouldn't be surprised if it was higher.