So which project will be completed first, this one or the one at Copley Place?
As I understand it Copley won't even start for another year and the construction will be slow bc of the turnpike decking.
So which project will be completed first, this one or the one at Copley Place?
I'm assuming that drill is for soil testing? Can't wait to see this get underway.
It's immaterial to the project as a whole, but I hope they move those trees instead of cutting them down. They're both old and quite healthy, and it'd be a shame to lose them. The proposed park next door would be more than adequate a space.
Isn't that the site for Pritzker's mid-rise?Suffolk construction fencing ...
Not on the "core triangle" but on the parcel opposite the Hilton across Belvidere. I understand this is part of the site but could be wrong about that. Sorry to get hopes up if I'm wrong about this, but I'm not sure what else would be getting under construction here other than the tower.
It'shappening.gif (?)
I posted this on the millennium tower thread but I think it is worth noting here as well.
The millennium tower went from 625-685 when the top floor and mechanicals are factored in. this looks to have a tall mechanical section at the top so it is easily possible it could grow that much. That would put it at 759 (taller than the prudential).
Boston Plateau Part 2: The Back Bay!!!
Hah! That seems like the most glass-half-empty way possible to react to this.