Has any interior work begun on the lower floors? Or do they wait until the tower is all closed up first?
From my vantage point I can see into varying parts of about the first 19 - 20 residential floors. I cannot see any kitchens or bathrooms, but the rooms I can see on the first 10-12 residential floors are pretty complete except for carpeting. Very typical to wait on carpeting as there's no sense putting it in to let it fade in the sun and get tracked on by prospective buyers; they'll install carpet later (aside from show units). But all wall, doors, trim, etc, looks very complete on those first 10-12 residential floors, and I can see thermostats, electrical outlets, and so on. I mean, except for carpets, they look 100%. No clue on kitchens / baths, but I'd be surprised if they hadn't done them, too.
Starting on about the 13th residential floor on up, I'm getting a more oblique angle, but I can see a lot of pretty done looking painted sheetrock, with a few punch list flags flying here and there. So, taking this with a grain of salt due to my angle, it seems there's maybe another 7-8 floors really far along. Above that my angle is so oblique the window glare makes it hard to tell if they've even hung rock. At the pace they were progressing down lower, though, I'm estimating there's sheetrock hung well above the first 20 residential floors.
My view down into the lower, non-residential floors is too oblique to reveal much.