Last edited:
IMG_7426 by Bos Beeline, on Flickr
IMG_7429 by Bos Beeline, on Flickr
IMG_7434 by Bos Beeline, on Flickr
IMG_7441 by Bos Beeline, on Flickr
IMG_7452 by Bos Beeline, on Flickr
IMG_7453 by Bos Beeline, on Flickr
IMG_7470 by Bos Beeline, on Flickr
IMG_7541 by Bos Beeline, on FlickrAlas, they’re probably not going to implode the old grad student housing.
Not going to happen. Eastgate will be taken down, though not by implosion. I guess we'll know when exterior demolition will start when a crane starts going up next to it.A good power washing or some fresh paint would go a long way.
IMG_7439 by Bos Beeline, on Flickr
IMG_7440 by Bos Beeline, on Flickr
IMG_7454 by Bos Beeline, on Flickr
IMG_7466 by Bos Beeline, on Flickr
IMG_7460 by Bos Beeline, on Flickr
IMG_7477 by Bos Beeline, on Flickr
IMG_7476 by Bos Beeline, on FlickrThe outside isn't the problem. It is all the dilapidated embedded building systems, in an unforgiving for retrofit architectural package..A good power washing or some fresh paint would go a long way.
IMG_7491 by Bos Beeline, on Flickr
IMG_7473 by Bos Beeline, on Flickr
IMG_7474 by Bos Beeline, on Flickr
IMG_7477 by Bos Beeline, on Flickr
IMG_7521 by Bos Beeline, on Flickr