Revere Beach Developments/infill | Revere

LOI filed for 526-546 RBB/former "The Ocean Club" plot:

http://www.bldup.com/projects/526-546-revere-beach-boulevard

Architect is ICON Architecture.

526-546-Revere-Beach-Boulevard-Waterfront-Square-MBTA-Blue-Line-Apartments-Baystone-Development-Proposal-ICON-Architecture-Engineering-Alliance.jpg


According to the Globe article:
Construction is expected to begin in May or June and could take up to 20 months, said principal Roy S. MacDowell III. Occupancy could begin in the fall of 2017.
 
Last edited:
LOI filed for the next phase of Waterfront Square:

http://www.bldup.com/projects/526-546-revere-beach-boulevard

Architect is ICON Architecture.

526-546-Revere-Beach-Boulevard-Waterfront-Square-MBTA-Blue-Line-Apartments-Baystone-Development-Proposal-ICON-Architecture-Engineering-Alliance.jpg


According to the Globe article:

I don't actually think this project is part of Waterfront Square. If I'm not mistaken, this project is slated for the empty plot of land just south of the Point-of-Pines, where the ill-fated "Ocean Club" project was to have been built before the 2008 mortgage bubble burst.
 
I don't actually think this project is part of Waterfront Square. If I'm not mistaken, this project is slated for the empty plot of land just south of the Point-of-Pines, where the ill-fated "Ocean Club" project was to have been built before the 2008 mortgage bubble burst.

Correct. I've adjusted my post. Thank you.
 
Correct. I've adjusted my post. Thank you.

Is that the same parcel where the almost comically derelict/dilapidated Fiesta Club (picture below, sorry it's so small) sat festering (in decidedly un-Yo Soy Fiesta-condition) for so many years?

It was rather conspicuously razed a few months back--a precursor to this project?

picture.php
 
Eww… Big dark wall with tiny windows is not the best design idea.
 
Is the landlord not legally obligated to put them up in a hotel or something??
 