- Joined
- Sep 15, 2010
- Messages
- 8,894
- Reaction score
- 271
David Bois of Arrowstreet discusses Waterfront Square with BLDUP Boston:
https://vimeo.com/144703372?ref=tw-share
https://vimeo.com/144703372?ref=tw-share
Construction is expected to begin in May or June and could take up to 20 months, said principal Roy S. MacDowell III. Occupancy could begin in the fall of 2017.
Architect is ICON Architecture.
LOI filed for the next phase of Waterfront Square:
http://www.bldup.com/projects/526-546-revere-beach-boulevard
Architect is ICON Architecture.
According to the Globe article:
I don't actually think this project is part of Waterfront Square. If I'm not mistaken, this project is slated for the empty plot of land just south of the Point-of-Pines, where the ill-fated "Ocean Club" project was to have been built before the 2008 mortgage bubble burst.
Correct. I've adjusted my post. Thank you.
The towers might be coming down!
Revere high-rise condemned 2 weeks after fire in 16-floor building
One resident tells NewsCenter 5 that they and fellow tenants were not given any warning, leaving many of them with no place to go.www.wcvb.com