Through the rearview mirror:
IMG_0788 by Bos Beeline, on Flickr
IMG_0971 by Bos Beeline, on Flickr
IMG_0973 by Bos Beeline, on Flickr
IMG_0976 by Bos Beeline, on Flickr
IMG_0982 by Bos Beeline, on Flickr
IMG_0984 by Bos Beeline, on Flickr
IMG_0986 by Bos Beeline, on Flickr
IMG_0985 by Bos Beeline, on Flickr
IMG_0988 by Bos Beeline, on Flickr
IMG_0992 by Bos Beeline, on Flickr
IMG_1002 by Bos Beeline, on Flickrby Bos Beeline, on Flickr
by Bos Beeline, on Flickr
IMG_0973 by Bos Beeline, on Flickr
IMG_0976 by Bos Beeline, on Flickr
by Bos Beeline, on Flickr
IMG_0984 by Bos Beeline, on Flickr
by Bos Beeline, on Flickr
by Bos Beeline, on Flickr
by Bos Beeline, on Flickr
by Bos Beeline, on Flickr
by Bos Beeline, on Flickr
Wow, between these twisting/sloping columns and the huge cantilevers, this is one complex building.
Seeing this daily, this whole project is the definition of complex. They must have run into 10000 hurdles from onset. Foundation work took nearly THREE YEARS. I went back and looked it up, this was supposed to open in 2020 then pushed to EARLY 2021 so I can't imagine things went anywhere near according to plan, pandemic aside. They must be 1.5-2 years behind given said complexity with this thing taking a month per floor on top of the interior work that is sure to take a good while.
That sounds right, I guess that's why nearly every other building down here is a box!While no inside information on the matter, there were noted several times big work stoppages on site for unknown reasons in 2019. My guess is engineering ran into some challenge and needed to go back to the drawing board several times.
IMG_2607 by Bos Beeline, on Flickr
IMG_2608 by Bos Beeline, on Flickr
IMG_2610 by Bos Beeline, on Flickr
IMG_2611 by Bos Beeline, on Flickr
IMG_2616 by Bos Beeline, on Flickr
IMG_2619 by Bos Beeline, on Flickr
IMG_2622 by Bos Beeline, on Flickr
IMG_2625 by Bos Beeline, on Flickr
IMG_2627 by Bos Beeline, on Flickr
IMG_2628 by Bos Beeline, on Flickr
IMG_2632 by Bos Beeline, on Flickr
IMG_2634 by Bos Beeline, on FlickrLooks like an extraordinary amount of rebar in this building, I guess that huge cantilever requires it.
After what happened in Miami, I would hope all contractors are looking again at their construction techniques. I'm sure the rebar/concrete ratios have to be precise to preserve both over time.Looks like an extraordinary amount of rebar in this building, I guess that huge cantilever requires it.
I am a little surprised ocean front construction doesn't require epoxy-coated rebar, to resist the salt corrosion issue. It is used in most northern highway construction at this point, IIRC.After what happened in Miami, I would hope all contractors are looking again at their construction techniques. I'm sure the rebar/concrete ratios have to be precise to preserve both over time.
IMG_3492 by Bos Beeline, on Flickr
IMG_3494 by Bos Beeline, on Flickr
IMG_3496 by Bos Beeline, on Flickr