East Boston Infill and Small Developments

944 Saratoga St.

1716310807681.png


“Plans are under review for a 4-story condo project at 944 Saratoga Street in East Boston. The project would include 24 condo residences, with 5 designated affordable. The proposed housing program includes a mix of 3 studios, 13 one bedroom, and 8 two-bedroom units, each with its own dedicated HVAC systems and hot water, laundry, and an open concept living space with nine-foot (9’) ceilings…”

https://www.bldup.com/posts/24-unit-condo-project-proposed-in-east-boston
 
-Approved

9 Geneva Street​

1718387030702.png


“This project will combine seven parcels in East Boston to create a new five-story 28-unit apartment building. Five of the units will be income-restricted. This project aligns with PLAN: East Boston and the Coastal Flood Resilience Overlay District resilient design standards. The project is a transit-oriented development, as it is within walking distance of both Maverick and Airport stations on the MBTA Blue Line. In alignment with PLAN: East Boston, the project will add a sidewalk connection to Maverick Street and street trees along the new sidewalk for shade and pedestrian comfort. Additionally, a $5,000 contribution will be made to Tree Eastie, a not-for-profit corporation that supports the continued expansion of the tree canopy in East Boston.”

https://www.bostonplans.org/news-ca...f4t4JPd-QR6tSDuR2pc4ca3X5m7uykj00bhpudH7Jjqku
 
A foundation permit has been pulled to begin work on the approved condo project 28-30 Geneva Street in East Boston. The existing structure on the site will be demolished to make way for a new 4-story project to include 19 residential units and 19 parking spaces.
 
The park is open. Photos taken 6/28.
 

Attachments

  • IMG_3301.JPG
    IMG_3301.JPG
    5.9 MB · Views: 51
  • IMG_3302.JPG
    IMG_3302.JPG
    7.1 MB · Views: 73
  • IMG_3304.JPG
    IMG_3304.JPG
    10.1 MB · Views: 74
  • IMG_3306.JPG
    IMG_3306.JPG
    7 MB · Views: 65
  • IMG_3307.JPG
    IMG_3307.JPG
    6 MB · Views: 54
  • IMG_3309.JPG
    IMG_3309.JPG
    6.7 MB · Views: 52
  • IMG_3315.JPG
    IMG_3315.JPG
    6.7 MB · Views: 60
  • IMG_3318.JPG
    IMG_3318.JPG
    6.8 MB · Views: 59
  • IMG_3295.JPG
    IMG_3295.JPG
    6 MB · Views: 70
Some movement on the, long delayed, project. As of 6/28.
 

Attachments

  • IMG_3245.JPG
    IMG_3245.JPG
    5 MB · Views: 59
  • IMG_3246.JPG
    IMG_3246.JPG
    6 MB · Views: 54
  • IMG_3247.JPG
    IMG_3247.JPG
    6.4 MB · Views: 83
  • IMG_3250.JPG
    IMG_3250.JPG
    6.7 MB · Views: 75
Photos taken last weekend (6/29). Various projects under construction or renovation, and some reciently competed.
 

Attachments

  • IMG_3231.JPG
    IMG_3231.JPG
    5.4 MB · Views: 63
  • IMG_3237.JPG
    IMG_3237.JPG
    5.8 MB · Views: 55
  • IMG_3259.JPG
    IMG_3259.JPG
    5.3 MB · Views: 54
  • IMG_3264.JPG
    IMG_3264.JPG
    7.1 MB · Views: 47
  • IMG_3269.JPG
    IMG_3269.JPG
    5.5 MB · Views: 50
  • IMG_3228.jpg
    IMG_3228.jpg
    5 MB · Views: 48
  • IMG_3232.jpg
    IMG_3232.jpg
    5.5 MB · Views: 45
  • IMG_3233.jpg
    IMG_3233.jpg
    5.7 MB · Views: 43
  • IMG_3236.jpg
    IMG_3236.jpg
    5.1 MB · Views: 48
  • IMG_3249.jpg
    IMG_3249.jpg
    4 MB · Views: 48
  • IMG_3255.jpg
    IMG_3255.jpg
    5.9 MB · Views: 46
  • IMG_3260.jpg
    IMG_3260.jpg
    5.7 MB · Views: 48
  • IMG_3267.jpg
    IMG_3267.jpg
    5.6 MB · Views: 62
Cont. from 6/29 walk.
 

Attachments

  • IMG_3272.JPG
    IMG_3272.JPG
    5.2 MB · Views: 49
  • IMG_3274.JPG
    IMG_3274.JPG
    4.7 MB · Views: 49
  • IMG_3278.JPG
    IMG_3278.JPG
    4.9 MB · Views: 50
  • IMG_3279.JPG
    IMG_3279.JPG
    5.8 MB · Views: 53
  • IMG_3281.JPG
    IMG_3281.JPG
    5.3 MB · Views: 52
  • IMG_3283.JPG
    IMG_3283.JPG
    5.5 MB · Views: 51
  • IMG_3291.JPG
    IMG_3291.JPG
    5.7 MB · Views: 44
  • IMG_3297.JPG
    IMG_3297.JPG
    5.4 MB · Views: 46
  • IMG_3282.jpg
    IMG_3282.jpg
    5.9 MB · Views: 45
  • IMG_3286.jpg
    IMG_3286.jpg
    5.8 MB · Views: 45
  • IMG_3293.jpg
    IMG_3293.jpg
    5.3 MB · Views: 36
  • IMG_3298.jpg
    IMG_3298.jpg
    5.4 MB · Views: 46
Front and back of a newly squeezed in Everett St 4 floor residential close to Maverick Square and the East Boston Greenway. Fun fact is this is abutting a couple of private way alleys, one of which is grass/dirt that leads to a footpath that goes through Eastie Farm. This is among a couple places in the very dense and urban Jeffries Point that has dirt private ways (other being Geneva Street by the airportborder (which also has a lot of private developments going in).
 

Attachments

  • 20240730_200246.jpg
    20240730_200246.jpg
    2.2 MB · Views: 61
  • 20240730_200505.jpg
    20240730_200505.jpg
    2.9 MB · Views: 60
Another 4 story stuck in on the quiet little dirt road in Eastie that could, Geneva St. I love how this quiet, private, dirt street is developing densely
 

Attachments

  • 20240731_091622.jpg
    20240731_091622.jpg
    2.1 MB · Views: 36
Has there been any news about what might be going in for all of this new retail space?
As of now - there is empty space at 2-10 Maverick Square in the ground/2nd floor restaurant space with no update of a tenant - I assume some stalemate of high rent or something, or liquor license issues.

Cafe Gloria on Maverick Street, is still seeking fundraising from customers à la Kickstarter type ways 🤣

The hotel on Orleans/Porter Street is slowly being outfitted inside but it was rumored to have a hotel bar and restaurant included.

There's been no news of a tenant for first and second floors of the Central Square 6-story residential either.

Expect to see a lot of retail/dining opportunities or even new openings as a result of this!

I think bostonrestauranttalk or licensing board meetings are where most of this is found.
 
Bummer about Cafe Gloria. I'd been excited about that place for a while, but even by the time we moved out of Eastie, it didn't seem to have made much progress and social media posts were few and far between.
 
Bummer about Cafe Gloria. I'd been excited about that place for a while, but even by the time we moved out of Eastie, it didn't seem to have made much progress and social media posts were few and far between.
Exactly. I think the past 3 years I've been here, the opening soon poster outside and wait has been going almost the whole time. Seemed pretty DoA. I liked the concept as well
 
Exactly. I think the past 3 years I've been here, the opening soon poster outside and wait has been going almost the whole time. Seemed pretty DoA. I liked the concept as well
Yeah, I followed along on Instagram as soon as I saw the signs. There are occasionally progress posts, but it's soooooo slow and I worry it'll just die. However, I did see that he's doing a popup at AXL the next couple of Saturdays. My wife used to take spin classes there, so I absolutely would have checked it out if we were still local.
 

944 Saratoga St.

View attachment 50697

“Plans are under review for a 4-story condo project at 944 Saratoga Street in East Boston. The project would include 24 condo residences, with 5 designated affordable. The proposed housing program includes a mix of 3 studios, 13 one bedroom, and 8 two-bedroom units, each with its own dedicated HVAC systems and hot water, laundry, and an open concept living space with nine-foot (9’) ceilings…”

https://www.bldup.com/posts/24-unit-condo-project-proposed-in-east-boston

This looks suspiciously like a 5-story project and not a 4-story one :) (which I'm completely on board with)
 
This looks suspiciously like a 5-story project and not a 4-story one :) (which I'm completely on board with)
This area is about to get very dense and even more TOD, once the space with the failing strip mall with BK, Subway, Rent a Center, and Rockland Trust and empty parking is sold off and turned into denser 4/5 story retail/residential.
 

Back
Top