How much of this project is going to be built over the Expressway tunnels?
Someone go get some close ups!
Three tower cranes for this one site seems like overkill. I assume that there are some restrictions about moving loads over adjacent properties and public ways that is forcing them to use so many.
I was under the impression that what was visible was one temporary crane, an assembled tower crane, the base of a tower crane, and a middle section to be placed on the base. (Thus: two tower cranes, and one temporary one to help set up those two)
How many of these remaining structures that are on or adjacent to the site will come down at some point during construction? (I'm referring to the vent stack (?) and the small structure behind the row of storefronts on Canal St.) Or is demolition done?
I figured it would be rebuilt to be incorporated into the new building, that they would be leaving it up until they were ready. Apparently not.