Crane is being used to support a pile driver. It's driving (metal?) struts into the ground. Earthmovers just seem to be pushing things around. Still have no idea what's going on there.
Seriously? That's a prime location for a smaller signature building not another park. There's already plenty of open space in the Navy yard. Is it now part of city planning "wisdom" that no one should be forced to walk more than 2 blocks or less to find some grass?
Did anyone notice they demo'd the warehouse across the 'Little Mystic' from this development? The one where you have to drive under the Tobin Toll Plaza from the Moran Terminal to get to it.
I'll go crazy if that gets developed before another Eastie Waterfront parcel, but good to see that something might be going on by the water.
Notice of Intent for DEP File No. 006-1299 from the Massachusetts Port Authority for the rehabilitation of existing
pier structures and steel piles at Mystic Pier 1 and Moran Terminal, 100 Terminal Street, Charlestown, Boston
Inner Harbor and Mystic River (Designated Port Area, Land Under Ocean, Fish Run).
It's going to include an adapted accessible playground, which will be great for Spaulding and their pediatric unit. I'm not sure of the soundness of the ground and surrounding pier jutting out into the harbor to support a building. Pretty sure Partners pulls a lot of the strings in the Navy Yard. They have a HUGE presence that's growing.
Odd that the boardwalk they're installing isn't in the plans at all. The plans make it look like the eastern edge of the pier is being left unfinished.
It doesn't show it in the first pic, but I think that it shows a boardwalk wrapping the pier in the second picture.
Is it just a new warehouse? They tore down the old one to replace piles in the pier.