Yea no reason theyd wait for the towers to go up everything shows it goes in with the construction of the podiums.
Ok, so it is part of podium construction. Any chance it opens as the first thing completed? (if so, could that be mid 2018?)Yea no reason theyd wait for the towers to go up everything shows it goes in with the construction of the podiums.
Ok, so it is part of podium construction. Any chance it opens as the first thing completed? (if so, could that be mid 2018?)
So is H on C. It's wall-to-wall with the arena, but they're fully detached except for the door in the middle.
I'm talking about the actual gap in the structural profile.
Pink is the structural profile as currently constructed. The T headhouse (red) is designed to fill up this gap on the ground floor. It is not a public walkway. It will be filled in.
Photo: BeeLine
It is not just a connecting point. The plan calls for a 60,000 sq. ft. addition to the garden including larger concourses. They are also going to make the entire south wall (side with h on c) glass according to a Boston Globe article last month.
Does anyone know what's in that area to the left of the Downeaster ticket window, all the way down to the escalator? I know there are some schedule racks there, and I think an "Information" booth, but that whole section will be coming out for the ground floor connection into the Hub, correct?
I think this was answered way upthread but can't find it, when the podiums are done, are they committed to immediately building the residential high rise?